
HVAC INSTALLATION
AC Installation in Kathmandu
A reliable AC installation starts with suitable system selection, correct capacity, sound pipework, proper drainage, electrical safety, and commissioning. Aircon supports residential, commercial, hospitality, healthcare, and industrial installations.
Plan an AC InstallationWe help coordinate equipment selection, indoor and outdoor unit placement, refrigerant pipework, drainage, electrical connection, testing, and handover for compatible systems.
Before installation starts
The site should be assessed for room size, heat load, occupancy, sunlight, outdoor-unit access, drainage route, electrical supply, noise, and future service access. Capacity and system type should be selected from the actual building requirement, not room size alone.
- Room or building use and occupancy
- Indoor and outdoor unit placement
- Pipe length, vertical rise, and drainage route
- Electrical supply and protection
- Access for future cleaning and maintenance

Installation quality details
Good installation protects future performance. Pipework should be clean and correctly supported, connections should be made and tested carefully, drainage should flow reliably, insulation should be continuous, and the system should be tested before handover.
- Secure indoor and outdoor mounting
- Correct copper pipe sizing and insulation
- Reliable condensate drainage
- Electrical and control checks
- Leak, vacuum, operating, and performance tests

Systems we can help install
The appropriate system depends on the space and operating goal. Options may include wall-mounted split, inverter split, ceiling cassette, ducted, floor-standing, VRV/VRF, ventilation, and other engineered HVAC solutions.

Service coverage
Our engineering team supports AC systems across Kathmandu, Lalitpur, Bhaktapur and the wider Kathmandu Valley.
Frequently asked questions
How do I choose the right AC capacity?
Capacity depends on room dimensions, heat gain, occupancy, windows, orientation, insulation, equipment, and usage. A site assessment gives a better basis than choosing only by room size.
Does AC installation include drainage and electrical work?
The exact scope should be confirmed in the quotation. A proper installation plan addresses drainage, pipework, insulation, mounting, electrical requirements, testing, and access.
Do you install inverter and VRV/VRF systems?
We support compatible split, inverter, cassette, ducted, and VRV/VRF installation requirements subject to site assessment, equipment selection, and project scope.
Need help with your AC system?
Speak with Aircon Engineering Solutions about repair, maintenance or a site assessment.